ISOBUS Task Controller (ISO TC)
The next evolution from TUVR:
- An Isobus implement can be connected to either an Intelliview IV, XCN-1050 or XCN-2050 display, showing both the implement operating screen and controlling rate / section at the same time via GPS.
- Often just a simple one-plug connection is required between the implement and tractor / XCN display.
- Implement operation is shown on the display UT (Universal Terminal).
- Commands for rate and section control are sent to the implement ECU from the Intelliview IV or XCN display.
